On the 27.5 hectare building site, a huge hall of 40 000 m2 was built with storage and production capacities. It has a prefabricated pillar structure made from reinforced concrete with 24 meter wide sections.

IMPLEMENTING

The construction works were running on a tight schedule: the hall and the service units were completed in less than 9 months. As a result of the special, American style health and safety procedures that were in effect in this project, there has not been a single accident at the site even after almost 400 thousand hours of work.

CURIOSITIES

From the top of the hall, one is able to see Kékestető, the highest point in Hungary.