Remediation of Berhida industrial park
TECHNICAL CONTENT
- Toxic metal contaminated subsoil removal: 36,700 tonna
- In situ deposition 36 100 tonna
- Construction of remediation system: 4 065 lm drainage ditch,
- 800 m³ drainage block
- Water clearing and drain system: gravel drain 2 685 lm , gravel block 4 500 m³
- Monitoring well system: 20 pcs
- Maintenace and operation of water purification and drainage system.
IMPLEMENTING
Technical supervision service of the construction works.